News and Events
08.07 '2010

The management of “Zarubezhstroy” Corporation met the delegation from the Saudi Arabia

08.07 '2010

There was held a meeting of management of “Zarubezhstroy” with the delegation from Republic of Congo

 JSC Zarubezhstroy commenced in Ulan-Bator (Mongolia) active construction of the second stage of “Moscow” residential district with the total area of 42 thousand sq. m on the area of 2,9 ha.

About the CorporationNewsCompaniesProjects
Pepsi Bottling Group Plant

Type of Order: New Construction of the Bottle Filling Plant
Ńountry: Russian Federation, Moscow Region, Domodedovo Area
Year of the Project: 2007 

Project Description:
The plant includes the following facilities:
• 1-floor production and storage house
• 3-floor administrative and household building,
• utility unit
• set of premises for cars service and electric loaders maintenance
• set of premises for refrigerators maintenance and storage
• cars and trucks washes
• cargo check points
• 2 level open car parking for 750 car spaces
• open parking for trucks
• onsite utility network.
Administrative and household buildings as well as 2 level car parking are designed in one-piece jointless ossature without girders and joints. The other buildings are to be in metal structures with sandwich panel walls and soft low pitch roofing.
The particularity of design conditions consists in potential karst hazard of the site.

Ňĺchnical Data:
Total area of buildings and facilities is 77 thousand sq. m